This document describes the practices to be adopted by field engineers during installation and maintenance of BT Pathway. A more detailed description of the product, along with customer programmable facilities and features, may be found in the Owner’s Manual, which should be read in conjunction with this document.
BT Pathway Installation and Maintenance manual
April 17th, 2010 · No Comments
MF/HF Marine Transceifer iM710RT
March 18th, 2010 · No Comments
This manual contains important safety and operating instructions for the IC-M710RT MF/HF MARINE TRANSCEIVER. The IC-M710RTGMDSS version has a high-stability crystal oscillator unit. This unit draws a slight current even when power to the transceiver is OFF. To prevent battery exhaustion when docking your vessel for extended periods, unplug the DC cable from the DC […]
Tamron Lens Aspherical AF 28 - 80 mm F/3.5 - 5.6
October 12th, 2009 · No Comments
MOUNTING/REMOVING THE LENS
Mounting
After removing the rear cap, place the lens in the camera mount aligning the lens mount index line with that of the camera body (Canon/Minolta/Pentax). For Nikon models, align the lens mount index line with the dot on the camera. Rotate the lens clockwise until it click-locks (counter-clockwise in case of Nikon body). […]